Quantcast
Channel: TOYO CONSTRUCTION CO., LTD.
Viewing all articles
Browse latest Browse all 214

Receipt of order for (working title) Construction Work of Inland Aquaculture Plant from FRD Japan Co., Ltd. (Futtsu city)

$
0
0

 Toyo Construction Co., Ltd. (President and Representative Director: Haruhisa Obayashi) has received the order
for “(working title) Construction work of Phase 2 inland aquaculture plant for FRD Japan Co., Ltd. (Futtsu city)”
from FRD Japan Co., Ltd. (Representative Director: Yoichi Tsuji / Tetsuro Sogo).

 Due to world population growth and changes in food culture, the demand for marine products as a source of
high-quality animal protein is increasing over the years, and inland aquaculture assumes a more important role.
FRD Japan has developed the original closed-circuit inland aquaculture system using bacteria, which has realized
the technology to stably produce salmon trout without using natural sea water. The company will work on
industrialization of inland aquaculture and develop their large-sized plants mainly in Asian countries including
Japan.

 

 This work is designed by us, and will include not only aquaculture plant facilities, but also new construction of
administration offices, processing plants and power control buildings as attached facilities. Upon completion, there
will be production facilities that produce an estimated 3,500 tons annually, which will create an environment that
will easily provide salmon trout, highly popular food in Japan.

 Toyo Construction, through our accumulated construction technologies and experiences for production facilities,
will actively participate in businesses that contribute to realization of a sustainable society.

 

Conceptual perspective

FRD’s aquarium in operation

 

【Outline of construction】

Name (working title) Construction work of Phase 2 inland aquaculture plant for
FRD Japan Co., Ltd. (Futtsu city)
Owner FRD Japan Co., Ltd.  https://frd-j.com/
Designer Toyo Construction Co., Ltd. – Office of first-class registered architects
Contractor Toyo Construction Co., Ltd.
Site Kazuma 739-5 and other, Futtsu city, Chiba prefecture
Construction term Dec. 1, 2023 through Jan. 31, 2026
Site

Total floor space: 14,486.52㎡

・Aquaculture plant: Steel structure 2F   ・Power control building Steel
                      structure 1F

・Admin. office: Steel structure 2F     ・WWT Control panel room: RC
                      structure 2F

・Processing plant: Steel structure 2F   ・Others

 

 

 

Contact

Toyo Construction Co., Ltd.

MX Promotion Div.

Public & Investors Relations Dept.

Phone: 03-6361-2691


Viewing all articles
Browse latest Browse all 214

Trending Articles