Toyo Construction Co., Ltd. (President: Kyoji Takezawa) and MAEDA CORPORATION (President: Koichi Obara) received an order for “Improvement Construction of Port of Sihanoukville Multi-Purpose Terminal” from the Port Authority of Sihanoukville (Kingdom of Cambodia) in November 2014 and recently began construction work. This project is being carried out with a yen loan provided by the Government of Japan through the Japan International Cooperation Agency (JICA). The total amount of the order to the joint venture (JV) is approximately \5.13 billion (value of order placed with Toyo Construction: approximately \3.59 billion). The work is scheduled for completion in July of 2017. For Toyo Construction, this will be the largest project in the Kingdom of Cambodia to date.

The Port of Sihanoukville is the only deep water port in Cambodia and is also a base port for economic activity. Accompanying the strong economic growth of Cambodia, the volume of cargo handled by the port is continuing to increase at a pace exceeding 10% per year. However, because general and bulk cargos other than containers are handled at an existing small-scale wharf, it is not possible to respond to the increase in demand.

To solve this problem, the aim of this construction project is to improve the multi-purpose terminal, which consists of a bulk cargo wharf and an oil supply berth. By increasing the port’s cargo handling capacity, the project is expected to contribute to increased foreign trade, supporting the continuing economic development of Cambodia.

As Cambodia has enjoyed high real GDP growth on the 7% level during the past several years, additional infrastructure improvement projects are also foreseen in the future. Taking advantage of the sales record which Toyo Construction has steadily accumulated since opening its Phnom Penh Office in 1997 and experience gained in this project, Toyo is contributing to the economic progress of Cambodia by participating in a variety of infrastructure improvement construction projects.

Project name Port of Sihanoukville Multi-Purpose Terminal Improvement Project (yen loan)
Client Port Authority of Sihanoukville
Contractor Joint venture of Toyo Construction Co., Ltd. and MAEDA CORPORATION
Location Sihanoukville, Kingdom of Cambodia
Period January 6, 2015 to July 6, 2017
Outline of work ・Dredging works 1,800,000m3
・Quaywall works Multi-purpose terminal berth (-13.5m) 330m
  Oil supply base berth (-7.5m) 200m
Revetment works 122m
・Reclamation works 350,000m3
Yard improvement, electrical and equipment construction

【Location of project】
cambodia-map-en
【Image of completed project】

kanseiyosou-img

For inquiries, please contact:
Toyo Construction Co., Ltd.
Public Relations Section (Mr. Takeshi Kitamura),
Administration and Planning Dept.
Tel: +81-3-6361-5461

Position of viewer of PDF


Viewing all articles
Browse latest Browse all 214

Trending Articles